NCREASE PHISICAL AVAILABILITY OF KOMATSU DOZZER D65P-12 LGP USING FMEA AT MINING NICKEL PT XYZ
| dc.contributor.author | Kuncoro, Fendi Jati | |
| dc.contributor.author | Galinium, Maulahikmah | |
| dc.contributor.author | Sutapa, I Nyoman | |
| dc.date.accessioned | 2026-05-21T04:09:23Z | |
| dc.date.issued | 2025-08-29 | |
| dc.description.abstract | The Komatsu Dozer D65P-12 LGP at PT XYZ’s nickel mining site often failed to reach the 80% physical availability (PA) target due to frequent undercarriage failures. This study aimed to improve the unit’s availability using FMEA, supported by DMAIC, Why-Why Analysis, 5W2H, and other reliability tools. The improvement program was carried out in two phases: January–December 2024 and February–May 2025. Main initiatives included mechanical modifications, structured undercarriage inspections, backlog management, and improved preventive maintenance. The results showed strong progress: PA increased from 72% to 85%, backlog completion rose from 19% to 75%, and undercarriage downtime dropped from 82.4% to 58.9%. Specific actions, such as sprocket bolt modifications (reducing failures from 128 to 6) and carrier roller reworks (from 9 to 3), effectively minimized recurring issues. Overall, this study proves that data-driven and failure-focused maintenance can significantly improve equipment availability in mining operations, while also offering useful insights for practitioners and future research. | |
| dc.identifier.uri | https://dspace-repository.sgu.ac.id/handle/123456789/174 | |
| dc.language.iso | en | |
| dc.publisher | Swiss German University | |
| dc.subject | Physical Availability | |
| dc.subject | FMEA | |
| dc.subject | DMAIC | |
| dc.subject | Why-Why Analysis | |
| dc.subject | 5W2H | |
| dc.subject | Dozer D65P-12 | |
| dc.subject | Undercarriage | |
| dc.subject | Mining Equipment Maintenance | |
| dc.subject | Weibull Analysis | |
| dc.subject | Preventive Maintenance | |
| dc.title | NCREASE PHISICAL AVAILABILITY OF KOMATSU DOZZER D65P-12 LGP USING FMEA AT MINING NICKEL PT XYZ | |
| dc.type | Thesis |
Files
Original bundle
1 - 5 of 6
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed to upon submission
- Description: