INCREASE PARTS AVAILABILITY SCANIA PRODUCT THROUGH PREVENTIVE MAINTENANCE IN LEADING INDONESIAN HEAVY EQUIPMENT COMPANIES CASE SITE SUPPORT KUTAI BARAT

dc.contributor.authorFebrianto, Anggi
dc.contributor.authorSofianti, Tanika Dewi
dc.contributor.authorBaskoro, Gembong
dc.date.accessioned2026-06-03T07:47:22Z
dc.date.issued2022-08-22
dc.description.abstractOne of the processes to minimize down time unit is the availability of good spare parts. In this study, we will discuss how the process of developing inventory management procedures in order to get the availability of spare parts is quite good. in this study, the desired goal is the result of the researcher at 90%. The DMAIC method is used in this study to improve the existing processes in the reordering point. Periodic review with demand fluctuations, vendors holding stock, and inspection programs is an implementation carried out in the inventory process in order to get the availability of slow-moving spare parts, fast-moving spare parts and spare parts that are monitored for damage. The results obtained are reorder quantity using Inspection which contributes 13% and for casting using holding stock vendors based on customer brainstorming contributed 38% while the forgetfulness made by distributor with the periodic review modeling system contributed 43% the prediction accuracy in January was 94% this support is greater than 2021, which is 88%, so there is an increase of 6% and a reduction in the delay time for repairs from 2021, the average order delay is 5.5 days to an order delay of 3.9 days.
dc.identifier.urihttps://dspace-repository.sgu.ac.id/handle/123456789/342
dc.language.isoen
dc.publisherSwiss German University
dc.subjectAvailability spare parts
dc.subjectInventory Management
dc.subjectPreventive Maintenance
dc.subjectScania Product
dc.subjectDMAIC
dc.subjectLean six sigma
dc.subjectPeriodic Review Inventory
dc.titleINCREASE PARTS AVAILABILITY SCANIA PRODUCT THROUGH PREVENTIVE MAINTENANCE IN LEADING INDONESIAN HEAVY EQUIPMENT COMPANIES CASE SITE SUPPORT KUTAI BARAT
dc.typeThesis

Files

Original bundle

Now showing 1 - 5 of 6
Loading...
Thumbnail Image
Name:
COVER.pdf
Size:
198.71 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
CHAPTER 1.pdf
Size:
84.91 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
CHAPTER 2.pdf
Size:
234.5 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
CHAPTER 3.pdf
Size:
78.24 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
CHAPTER 4.pdf
Size:
1.41 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description:

Collections